HKT#5 made it’s debut performance at the Annual Rangerville Party in Alger, WA. This was a huge private event with great music and loads of yard art. HKT#5 ran most of the day and all night for a total of about 16 hours.
I made a protective ‘wire shelf’ container with black painted mesh screen to protect the Tron. HKT#5 ran right down at audience eye level at LOUD band volume (low Tron) value. The Audio ‘Out-to-In’ sequence was fantastic.
Once again, HKT#5 was well received.